Product Diagram: | Product Image: |
Project P568 – Midfield Arup Development Works
|
FTJ-CHEC-ZHEC Joint Venture |
Contract no. 3206, Three Runway SystemProject.Main Reclamation Works
|
Airport Authority |
DC/2013/10 Design, Build and Operate San Wai Sewage Treatment Works – Phase 1
|
ATAL CONSTRUCTION LIMITED |
Main Contract (Phase 2A works) – Proposed Chu Kong New Terminal Facilities,
Tuen Mun Town Lot No.491, New Territory
|
Concentric construction Ltd |
CV/2016/08 Queen’s Hill Development – Sewage Pumping Station Works
|
China Geo-Engineering Corporation |
HY/2014/08 Central Kowloon Route Yau Ma Tei East
|
BK-SK-JV |
Proposed Residential Developement at Inland Lot No. 8949 – 21,23&25
BORRETT ROAD, H K |
CR Construction Company Limited |
SS C505 Construction ofLiantang/Heung Yuen Wai Boundary ControlPoint (BCP) –
BCP buildings and associatedfacilities |
建築署(ASD) |
KL2014/01 Kai Tak Development-Stage2 InfrastructureWorks for Developments
at Southern Part ofthe Former Runwayioning |
大陸工程–捷章建築聯營/CEC-CCC JV |
HY/2011/08 Construction of tunnel buildings, installation of route-wide electrical and mechanical works and TCSS, and associated works for tunnel commissioning. |
Leighton Joint Venture |