Temporary Steel Deck for CLP Cable and Comm. Duct HKIA 3303 – Third Runway and Associated Works ![]() |
HKIA 3303 Temporary Steel Working Platform For AGL Pile Cap Works ![]() |
KL2014/01-Kai Tak development – infrastructure works for developments at the southern part of theformer runway ![]() |
SS G506 – Glass railing, ironware, glass canopy, steelframe, stainless steel of construction of Station Squareat Kai Tak Phase ![]() |
Contract No.: SPW 08/2018Landscape and Greening Works at Cyberport Preliminary Treatment works ![]() |
HY/2019/17 Retrofitting of Escalators for Footbridge Across Castle Peak Road – Kwai Chung Near MTR TAI WOHAU Station Exit B ![]() |
HY/2019/17 Retrofitting of Escalators for Footbridge Across Castle Peak Road – Kwai Chung Near MTR |
Hing Fu Engineering CompanyLtd
|
Temporary Steel Deck for CLP Cable and Comm.Duct HKIA 3303 – Third Runway and Associated
Works
|
3303 SAPR JV
|
SS G506 – Glass railing, ironware, glass canopy, steelframe, stainless steel of construction of Station Square at Kai Tak Phase
|
SFK-CEC Joint Venture
|
KL2014/01-Kai Tak development – infrastructureworks for developments at the southern part of the
former runway
|
CEC-CCC JV
|
Main Contract (Phase 2A works) – Metal Fence andTrellis Cable System,Stainless Door of Proposed ChuKong New Terminal Facilities, Tuen Mun Town LotNo.491, New Territory
|
ConcentricConstruction Co.,Ltd.
|
HKIA 3303 Temporary Steel Working Platform For AGL Pile Cap Works
|
Rich Crown Engineering Ltd
|
Contract No.: SPW 08/2018 Landscape and Greening Works at Cyberport Preliminary Treatment works |
FUNG SHING STEEL CO.LTD |
3303/SC/M041 Design, Supply and Delivery of Stainless Steel Works for Construction of BoxCulverts, Underground Utilities and WVT
|
3303 SAPR JV
|