Temporary Steel Deck for CLP Cable and Comm. Duct HKIA 3303 – Third Runway and Associated Works |
HKIA 3303 Temporary Steel Working Platform For AGL Pile Cap Works |
KL2014/01-Kai Tak development – infrastructure works for developments at the southern part of theformer runway |
SS G506 – Glass railing, ironware, glass canopy, steelframe, stainless steel of construction of Station Squareat Kai Tak Phase |
Contract No.: SPW 08/2018Landscape and Greening Works at Cyberport Preliminary Treatment works |
HY/2019/17 Retrofitting of Escalators for Footbridge Across Castle Peak Road – Kwai Chung Near MTR TAI WOHAU Station Exit B |
HY/2019/17 Retrofitting of Escalators for Footbridge Across Castle Peak Road – Kwai Chung Near MTR | Hing Fu Engineering CompanyLtd |
Temporary Steel Deck for CLP Cable and Comm.Duct HKIA 3303 – Third Runway and Associated
Works
|
3303 SAPR JV |
SS G506 – Glass railing, ironware, glass canopy, steelframe, stainless steel of construction of Station Square at Kai Tak Phase | SFK-CEC Joint Venture |
KL2014/01-Kai Tak development – infrastructureworks for developments at the southern part of the
former runway
|
CEC-CCC JV |
Main Contract (Phase 2A works) – Metal Fence andTrellis Cable System,Stainless Door of Proposed ChuKong New Terminal Facilities, Tuen Mun Town LotNo.491, New Territory | ConcentricConstruction Co.,Ltd. |
HKIA 3303 Temporary Steel Working Platform For AGL Pile Cap Works | Rich Crown Engineering Ltd |
Contract No.: SPW 08/2018 Landscape and Greening Works at Cyberport Preliminary Treatment works |
FUNG SHING STEEL CO.LTD |
3303/SC/M041 Design, Supply and Delivery of Stainless Steel Works for Construction of BoxCulverts, Underground Utilities and WVT | 3303 SAPR JV |